FREE ROOFING TOOL

Free roofing estimate template

A roofing estimate is built from squares, not square feet. Enter the footprint and the pitch, and the template converts it to squares, applies your waste percentage, and prices tear-off, underlayment, flashing, ventilation, dumpster and permit as separate lines. Most residential asphalt work lands at $350 to $700 per square installed. Download a print-ready PDF in one click.

Fill in the fields below. Nothing is saved to a server. When you're ready, click Download PDF.
ESTIMATE
Estimate # Date Valid Until
BILL TO
ROOF MEASUREMENT
Roof pitch (sets the pitch factor) Waste percentage Tear-off layers Roof complexity Measured squares (footprint x pitch factor, plus waste)
Scope of work
Description Unit Price Qty (squares / units) Line Total
Materials specified
Decking and unit rates (billed only if needed)
Insurance claim and warranty
Exclusions
Additional notes
Squares (with waste)0.0
Subtotal$0.00
$0.00
Contract total$0.00
Price per square$0.00
$0.00

This estimate is valid until the date shown above. Shingle and material pricing moves, so prices are subject to change after that date. Decking and fascia replacement is billed at the unit rates shown and is discovered only after tear-off. Exclusions listed above are not part of this price.

What should a roofing estimate include?

A roof estimate that leaves a line off is a roof estimate you finish out of your own pocket. These are the lines that belong on every one.

  • Measured squares - footprint area, the pitch factor applied, and the waste percentage shown separately so the customer sees the math
  • Tear-off by layer - one layer, two, or three, priced per square, because the second layer is the one that eats a day
  • Decking allowance - a unit rate per sheet and a written note that rot is found only after tear-off, never a flat guess
  • Underlayment and ice and water shield - type, and exactly where the ice barrier runs: eaves, valleys, around penetrations, and how far up from the wall line
  • Flashing - step flashing at walls, counter flashing, chimney, skylights, pipe boots, and whether each is new or reused
  • Ventilation - ridge vent linear feet, intake at the soffit, and any box or turbine vents, since intake is what most re-roofs get wrong
  • Drip edge and starter - gauge, color, and the starter course at eaves and rakes
  • Dumpster, permit, and cleanup - the container size and placement, the permit fee as a pass-through, and a magnet sweep of the yard and driveway
  • Labor per square - your rate, with any steep charge above 8/12 broken out rather than hidden
  • Insurance supplement line - present when the job is a claim, so the homeowner knows a supplement is normal and not a price increase
  • Exclusions and warranty - what is not in the price, plus workmanship term and the manufacturer warranty on the shingle line specified

How do I turn a roof measurement into a price?

Footprint times pitch factor times waste gets you squares. Squares times your installed rate gets you the price.

Take the footprint from a satellite measurement or a tape on the ground, say 1,800 square feet. A 6/12 pitch multiplies that by 1.118, so the actual roof surface is about 2,012 square feet, or 20.1 squares. Add 12 percent waste on a straightforward hip and you order and price against roughly 22.5 squares. That is the number every other line hangs off.

Then price the two halves separately in your own head, even if the customer sees one rate. Material for a mid-grade architectural shingle system, including underlayment, drip edge, starter, ridge cap and fasteners, commonly runs a couple hundred dollars a square delivered. Labor for install on a walkable pitch commonly runs $75 to $150 per square, and it climbs fast above 8/12. Add tear-off per layer, the dumpster, and the permit, and the all-in number for most residential asphalt work lands in the $350 to $700 per square installed band. Our guide to pricing a roofing job breaks that spread down by material.

Check yourself against price per square before you send it. A 22.5-square job at a $9,800 contract total is $436 a square. If your number comes out at $210 a square, you dropped a line. If it comes out at $900, you either have a slate roof or a math error. That single ratio catches more estimating mistakes than any review.

Which lines on a roofing estimate cause the most disputes?

Four lines cause almost every roofing argument, and all four are solved in writing before the crew arrives.

  • Decking - the homeowner heard a price, then got a bill for eleven sheets of plywood. State the unit rate on the estimate, state that rot is invisible until tear-off, and photograph every sheet you replace before you cover it
  • The deductible - on an insurance job the homeowner owes their deductible. Say it plainly on the estimate. Waiving it, discounting it, or "eating it" is fraud in most states, and the carrier does check
  • Ventilation - a ridge vent with no soffit intake does nothing, and the homeowner will blame the new roof for the same hot attic. Price the intake or write down that it was declined
  • Gutters and landscaping - tear-off dents gutters and flattens shrubs. Say who protects what, whether gutter cleanout is included, and that the magnet sweep happens at completion

Two other habits save money. Photograph the roof before you touch it, because storm-damage claims turn on pre-existing condition. And carry the estimate scope into the field verbatim, so the crew installs what was sold. The roofing inspection checklist gives you the pre-job documentation, and Claver for roofing contractors keeps the estimate, the change orders, and the invoice on one record. Pricing starts at $1 for 14 days, then $19/mo.

One standards note worth having in your back pocket: NRCA guidance and most manufacturer instructions treat ice barrier placement, fastener pattern, and ventilation ratio as warranty conditions, not suggestions. OSHA requires fall protection for residential roofing work at six feet. Both cost time, both belong in your labor rate, and neither is optional when an adjuster or an inspector is reading your estimate.

Keep the numbers when the job is booked

Inside Claver the same estimate becomes the quote you send, and the quote becomes the invoice you get paid on, so nobody retypes a price between the driveway and the bank.

Start for $1
$1 for 14 days, then $19/mo. Card required. Cancel any time.

Roofing estimate template FAQ

How do I write a roofing estimate?
A roofing estimate starts with measured squares, not a guess. Measure the footprint, apply the pitch factor, add 10 to 15 percent waste on a simple gable and 15 to 20 percent on a cut-up hip, then price material and labor per square. Add tear-off by layer, underlayment, ice and water shield, flashing, ventilation, dumpster, and permit as their own lines. A 20-square roof at $350 to $700 per square installed lands near $7,000 to $14,000.
How much should I charge per square for a roof?
Most residential asphalt work prices at $350 to $700 per square installed, and that spread is real. Steep pitch, a second or third tear-off layer, two-story access, and a cut-up roof all push toward the top. Labor alone commonly runs $75 to $150 per square for architectural shingle on a walkable pitch. Price your own labor from crew cost per hour and squares per crew-day, not from what the last guy quoted.
What pitch factor should I use on a roofing estimate?
Pitch factor converts flat footprint area to actual roof surface. A 4/12 roof multiplies by 1.054, 6/12 by 1.118, 8/12 by 1.202, 10/12 by 1.302, and 12/12 by 1.414. Anything over 8/12 also needs a steep-charge on labor, because the crew is on toe boards and harnesses and production drops. OSHA fall protection applies at six feet on residential roofing, and that time belongs in your labor number.
Should a roofing estimate include a waste percentage?
Yes, and it should be visible. A simple gable roof takes 10 percent waste, a hip roof with valleys and dormers takes 15 to 20 percent, and a complicated roof with multiple ridges can push higher. Waste covers starter, ridge cap cuts, and the bundles you open and never finish. Bury it and you eat it. Show it as a line and the customer sees you measured instead of rounding up.
How do I bill an insurance supplement on a roofing job?
Put a supplement line on the estimate from the start so the homeowner knows the process. When the adjuster's scope misses steep charge, a second layer, drip edge, ice and water in the valleys, or code-required ventilation, you document it with photos and submit a supplement against the carrier's estimate. Never promise to waive a deductible. That is insurance fraud in most states and it will cost you your license.
What should a roofing estimate exclude?
Name the exclusions or you will do the work for free. Decking replacement is the big one: price it per sheet as a unit rate and state that rotten decking is discovered only after tear-off. Also exclude structural repair, chimney masonry, gutter replacement, interior drywall and paint from prior leaks, and satellite dish reinstallation. Written exclusions are what turn an argument into a change order.
Do I need a permit line on a roofing estimate?
Almost always. Most jurisdictions require a permit for a full tear-off and re-roof, and many require ice barrier and ventilation to current code even when you are matching what was there. Put the permit as a pass-through line with the fee, and note that inspections may be required after dry-in and at completion. Quoting a roof without a permit line is how a job goes upside down on day two.
Is this roofing estimate template really free?
Yes, the roofing estimate template is free with no signup, no credit card, and nothing saved to a server, so customer and property details stay on the device. Fill in the fields, print or download the PDF, and send it. Nothing is uploaded and nothing is tracked against the estimate you build.
Can Claver turn a roofing estimate into an invoice?
Yes, Claver carries a roofing estimate into the job and the invoice on the same record, so the squares and the waste percentage never get retyped between the driveway and the bank. E-signature, change orders, and progress billing on a multi-day tear-off are on the Crew plan.

Start your $1 trial

$1 for 14 days, then $19/mo. Cancel any time from settings.

Starter · $1 trial
or sign up with email

Next: your name, your business and a card. Nothing is charged until you finish.

Card details go straight to Stripe. Claver never stores your card number.

Already have an account? Sign in