Send a $4,800 cedar privacy fence quote from the customer's backyard, measured, materialled, dated. Dispatch the install crew and post-hole truck the morning the materials land. Track which Dallas neighborhoods pay 51% margin and which ones bleed you on rocky soil.
$1 for 14 days, then $19/mo. Card required. Cancel any time.
The $1 trial is Starter. Dispatch, two-way texting and job costing are on Crew ($39/mo).
From $19/mo, users included. Verified competitor prices·CSV import from Housecall Pro, Jobber and ServiceTitan·No per-seat fees, ever
Features fence shops use
Built for fence contractor companies
The five things that decide whether you book the $4,800 cedar privacy job or lose it to the next contractor. On-site linear-foot quoting with materials priced in. Crew and post-hole truck dispatch the morning materials land. Photo records of the property line and final install. Real margin per job including rocky soil and slope upcharges. A photo report and signed documents for the paperwork HOAs ask for. All in one app. Built for the tech who has augered 47 post holes through Dallas caliche in 98-degree heat.
On-Site Linear-Foot QuotingStarter
Walk the property line with the customer. Measure with a laser or wheel and photograph each segment. Build the quote in six minutes. That is 142 linear feet of six-foot cedar privacy plus one walk gate and one drive gate for $4,850. This includes cedar pickets, treated four-by-four posts, hardware, install and dump. The customer signs digitally and pays a 30% deposit before you back out of the driveway.
Crew and Post-Hole Truck DispatchCrew
Materials land Friday afternoon. Claver assigns the install crew and the post-hole auger truck and the concrete delivery to Saturday morning at the same address. Saturday at seven am, the three-person install crew and auger truck arrive with 14 bags of concrete on-site by 6:55 am. You avoid asking where the auger is at 7:14 am.
Photo Records of Property Line and FinalCrew
Take pre-job photos of the existing condition and property line markers and the neighbor's fence on the other side. Take post-job photos of the install and gate operation and cleanup. Claver timestamps every photo and exports a branded PDF photo report, the kind an HOA board or a picky homeowner wants to see before and after.
Real Margin Per JobCrew
Track linear feet, post count, gate count, soil type like loam versus caliche versus rocky, slope grade and dump fees as custom fields on the job, then let job costing show labor, materials and margin per job. For example, a $4,850 cedar job in loam soil might clear 51% margin, while the same spec in a caliche shelf that adds 90 minutes per post might clear less. Now you know which ground costs you time.
Customer Portal for Job RecordsStarter
Many HOAs want architectural review paperwork before an install. Build a custom document (a work order or completion certificate) with your materials spec and photos, add an e-signature line for a neighbor if the HOA requires one, and email the customer the photo report and the signed document to bring to the board.
Starter is $19/mo. Texting, AI and dispatch start on Crew at $39. The phone line and AI receptionist are on Business at $79.
Why fence shops switch
Why fence contractor companies choose Claver
A brutal seasonal swing
Fence contracting is a high-ticket residential trade with a brutal seasonal swing. The April to June backyard rush is when you make 60% of your annual revenue. The contractors who win are the ones who quote on-site, dispatch the install crew and materials to the same address on the same morning, and keep photo records of the work for the HOA and the customer.
The shops that lose are still doing the 2010 playbook. They tell the homeowner to call and they will come out next Tuesday for a measure. By next Tuesday the homeowner has booked with the next contractor who showed up Saturday with a tape measure and a quote.
The on-site quote is the engine. The materials-day dispatch is what makes the install profitable.
For example, say you walk the property line with Mrs. Castillo in Plano on a Saturday morning. Walk the backyard perimeter with the laser measurer or wheel for the run along the alley. You measure 142 linear feet, 28 posts at seven-foot spacing, one four-foot walk gate and one ten-foot two-leaf drive gate. The six-foot cedar privacy features cedar one-by-six pickets and treated four-by-four posts. You build the quote in the app for $4,850, materials and labor and fees broken out with your margin built in. The customer sees photos of the existing condition alongside the spec breakdown, signs digitally and pays a deposit through Stripe on the spot. You stop losing the job to "let me think about it."
Where materials-day dispatch leaks money
Materials-day dispatch is where most fence contractors leak the most operational money. Materials land Friday afternoon at the customer's house or your yard. Saturday morning the install crew shows up at seven am, but the post-hole auger is at the previous job site. The concrete is supposed to be delivered at eight am but the truck is running late. Marcus is still 22 minutes out because nobody told him to bring the gas-powered tamper. Claver assigns the install crew, the auger truck, the concrete delivery of 14 bags of Quikrete, and the gas tamper to Saturday at the same address by 6:55 am. Marcus opens the app at 6:30 am and sees seven am at Castillo for 142 linear feet of cedar privacy and two gates. The materials were delivered Friday. Auger truck number two is already assigned. Concrete delivery is at 7:30 am.
Photo records are what protect you with the HOA and protect you with the customer. Take pre-job photos of the existing chain-link condition, the rotted four-by-four posts at the corners, and the neighbor's privacy fence on the back side to match the height and style for the architectural review. Take during-install photos of post-hole depth, concrete pour, picket alignment, and gate hardware. Take post-job photos of the completed fence from four angles, gate operation, and cleanup. You export the whole set as a branded photo report to attach to whatever the HOA board asks for.
Which neighborhoods pay
Job costing tells you which neighborhoods pay and which ones bleed you. For example, a $4,850 cedar job in loam soil with an easy auger might clear 51% margin, while the same spec job on a caliche shelf that adds 90 minutes per post and needs a rented stronger auger might clear far less. Track linear feet, post count, soil type and slope as custom fields on the job, and job costing does the math. Now you know which ZIPs to grow and which to bump on price next season.
The photo report is also what turns the fence-curious neighbor into your next lead. It shows the completed install and the materials spec. She forwards it to her HOA neighbor who is thinking about replacing his rotted shadow-box. He sees the documentation, the photos and the price breakdown, and books his measure with you instead of getting three competing bids.
Cancel anytime. 20-minute migration from your current tool.
Pricing
Pricing that works for fence shops
$19/mo to start. $39/mo for growing teams. $79/mo for the full toolkit. AI summaries, app phone line, on-site linear-foot quoting, crew dispatch, real-time job costing, photo reports for HOA paperwork. Same plans as every Claver page, no fence upsell.
Simple pricing, users included
Every plan includes unlimited jobs, quotes, invoices, and Stripe payments. Texting, AI, dispatch and job costing start on Crew. The phone system and full back office are on Business.
Starter: $1 for 14 days, then $19/mo. · Cancel anytime · Your data exports as CSV
Common questions
Common fence software questions
No marketing dance. The questions fence owners ask before they sign up.
Does Claver build on-site linear-foot quotes?+
Yes. Walk the property line with the customer. Measure with laser or wheel and photograph each segment. Build the quote in 6 minutes, 142 linear feet of 6-ft cedar privacy + 1 walk gate + 1 drive gate = $4,850 (materials $2,180 + install labor $1,840 + dump fees $185 + permit $95 + margin). Customer signs digitally and pays a 30% deposit through Stripe before you back out of the driveway. The materials order goes out Monday. Install is on Saturday.
Can it dispatch the install crew and auger and concrete to the same morning?+
Yes. The dispatch board assigns the install crew, the post-hole auger truck, the concrete delivery (Quikrete 14 bags), the gas tamper, and any specialty equipment to the same install address by 6:55am Saturday. Crew lead opens the app at 6:30am and sees: 7am at Castillo, 142 LF cedar + 2 gates, materials delivered Friday, auger truck #2 assigned, concrete delivery 7:30am. No "where's the auger?" at 7:14am.
Can it help with HOA architectural review documentation?+
Yes, but it doesn't generate or file anything for you automatically. Photograph the existing condition and the neighbor's fence, build a custom document with your materials spec, and add a signature line if the HOA wants a neighbor's sign-off. Claver doesn't file anything with the HOA for you, but it hands you a clean, photo-backed packet to submit instead of piecing one together by hand.
Can I import customers from ServiceTitan, Jobber, or Housecall Pro?+
Yes. Export your customer list as CSV from ServiceTitan, Jobber or Housecall Pro and upload it to Claver. The wizard maps the columns. Most fence shops finish the migration in 30-45 minutes. We'll personally help if anything looks off, email [email protected].
What does Claver cost for a fence shop?+
$19/mo for Starter (2 users). $39/mo for Crew (8 users) when you want texting, AI, and the dispatch board. $79/mo for Business with the full toolkit, on-site quotes, crew dispatch, real-time job costing, ad-conversion tracking. No contract. Cancel anytime.