Free pool maintenance checklist
A weekly pool stop is five things in order: test and balance, clean, empty the baskets, walk the pad, log the chemicals. Enter readings below and each one flags against target: free chlorine 1.0 to 3.0 ppm, pH 7.4 to 7.6, TA 80 to 120, CYA 30 to 50, calcium hardness 200 to 400. Print the customer summary before you leave.
This sheet records readings and work performed during this visit. Water chemistry moves with weather and bather load between visits. Target ranges shown follow published industry operating ranges and may differ for a spa, a commercial pool, or a pool under a local health code.
What should a weekly pool service checklist cover?
A pool stop is fifteen to twenty-five minutes if the route is tight. The checklist is what keeps every one of those stops the same.
- Water testing. Free chlorine, pH, total alkalinity, cyanuric acid and calcium hardness, plus salt on a salt pool, every reading written down
- Water clarity. Clear, hazy, cloudy or green, because a note this week explains the shock next week
- Skim, brush and vacuum. Surface, walls, steps, benches and the waterline tile, then the floor
- Baskets. Skimmer and pump baskets emptied, pump lid o-ring lubed and seated, cleaner bag emptied
- Filter pressure. Current reading against the clean starting pressure, which is your earliest warning on the pad
- Equipment walk. Pump, heater, salt cell, timer or automation, valves, lights, and the safety items
- Water level. Mid-skimmer, topped off if low, and the customer told if it keeps dropping
- Chemicals added. Product and amount, so the next tech and the next invoice both know what went in
- Photos. The water, the pad, and anything you flagged, which takes ten seconds and settles most disputes
- Customer summary. Readings, what was added, what you saw, left every visit
What are the target numbers on a pool service route?
Five numbers, and they are checked in a specific order. Chasing them out of order is how a tech spends three visits on one pool.
Test total alkalinity before you touch pH. TA at 80 to 120 ppm is the buffer that holds pH steady, so a pool that swings pH every single week is usually a low-TA pool, not a pH problem. Fix TA and pH stops fighting you.
Then pH at 7.4 to 7.6. Above that, chlorine loses effectiveness and scale starts on the tile and the cell. Below it, the water gets aggressive on plaster, grout and metal. A swing of more than about 0.6 units is worth dosing in stages with the pump running rather than all at once.
Free chlorine at 1.0 to 3.0 ppm on a residential pool, and cyanuric acid at 30 to 50 ppm outdoors to keep the sun from burning it off. CYA is the one that bites you: nothing removes it except dilution, and a pool at 90 ppm needs a partial drain and refill, not another chemical. If the customer has been running trichlor tabs all summer, check CYA before you diagnose anything else. Calcium hardness at 200 to 400 ppm protects plaster on the low side and prevents scale on the high side.
PHTA publishes the recommended operating ranges the industry works to, and a commercial pool under a local health code may have tighter ones. The pool chemical dosing calculator turns a reading and a pool volume into an actual dose in ounces or pounds, so nobody is guessing at the tailgate.
How does the checklist make the route more profitable?
Three ways, and none of them are about cleaning faster.
- It finds the repair before the customer does. A weeping pump seal noted in May is a scheduled repair with a quote. The same seal in July is an emergency call, an angry customer, and a green pool you clean for free
- It kills the "did you even come" call. A summary with readings and chemicals added, sent every visit, ends the most common reason pool customers cancel
- It makes a new tech productive in a week. The route standard lives on the sheet instead of in the head of whoever has run it for six years
- It protects you on chemical cost. Logging what went in every stop is how you find out that one pool is eating four gallons of chlorine a week and needs a price change or a CYA correction
Filter pressure trending is the single most underused line on the sheet. Write the clean starting pressure after every backwash, then compare weekly. A rise of 8 to 10 psi over clean means service. A drop means a suction-side problem, usually a basket or a low water level, and catching that early is what keeps a pump from running dry.
For what a route stop should be priced at, the pool service pricing calculator builds it from your real minutes, chemical cost and drive time, and the pool service and build cost guide has the market ranges. Claver for pool service companies keeps the checklist, the route, the photos and the invoice on one record, and pricing starts at $1 for 14 days, then $19/mo.
Related pool service tools
Keep the numbers when the job is booked
Inside Claver the same estimate becomes the quote you send, and the quote becomes the invoice you get paid on, so nobody retypes a price between the driveway and the bank.
Start for $1